post-thumbnail

Fireplace Final Phase

1
After working on the fireplace for a year and a half it is finally finished. It was installed and ready to use on Christmas Eve. It was ex...
post-thumbnail

Fireplace Phase 5

0
The fireplace is almost complete a few more weeks and it will be ready to install. The mantel has been cut to fit and is ready to be staine...
post-thumbnail

Fireplace Phase 4

0
Working on the insert has been extremely time consuming, as it has to be custom made to fit the existing firebox of the fireplace. The inse...
post-thumbnail

Bathroom Etc.

0
I stained the cabinent that the sink goes in and the one shelf an American Chesnut. I stained the woodwork and trim a Classic Oak color. I...
post-thumbnail

Bathroom tub

0
The area by the tub actually went pretty well. The surround was pretty easy to take down and the walls behind it were really horrible looki...
post-thumbnail

Bathroom Walls

0
The walls in the bathroom were more complicated to do. Some of the walls were made out of cinder block and others were made from wall board...
post-thumbnail

Bathroom Floor

0
The good news was that the boards underneath the sub floor were still in good condition. There were a couple of spots on the wood that had ...
post-thumbnail

Bathroom Phase 1

0
Finally got around to remodeling the bathroom. We started over Labor Day weekend, and finally finished on the Sunday September 18, 2011. ...
Home

Video of the Day

Popular Posts